Abstract
We discuss the traditional hierarchical approach to production planning and scheduling, emphasizing the fact that scheduling constraints are often either ignored or considered in a very crude way. In particular, we underline that the way scheduling is carried out is crucial for the capacity constraints on the lot sizes. Usual methods to handle capacity in theory or in practice are reviewed. Finally, we present an approach that tries to overcome these drawbacks by capturing the shop–floor capacity through scheduling considerations. International Federation of Operational Research Societies 2002.
Author supplied keywords
Cite
CITATION STYLE
Dauzère–Pérès, S., & Lasserre, J. B. (2002). On the importance of sequencing decisions in production planning and scheduling. International Transactions in Operational Research, 9(6), 779–793. https://doi.org/10.1111/1475-3995.00388