Scheduling is a key factor for operations management as well as for business success. From industrial Job-shop Scheduling problems (JSSP), many optimization challenges have emerged since de 1960s when improvements have been continuously required such as bottlenecks allocation, lead-time reductions and reducing response time to requests. With this in perspective, this work aims to discuss 3 different optimization models for minimizing Makespan. Those 3 models were applied on 17 classical problems of examples JSSP and produced different outputs. The first model resorts on Mixed and Integer Programming (MIP) and it resulted on optimizing 60% of the studied problems. The other models were based on Constraint Programming (CP) and approached the problem in two different ways: a) model CP1 is a standard IBM algorithm whereof restrictions have an interval structure that fail to solve 53% of the proposed instances, b) Model CP-2 approaches the problem with disjunctive constraints and optimized 88% of the instances. In this work, each model is individually analyzed and then compared considering: i) Optimization success performance, ii) Computational processing time, iii) Greatest Resource Utilization and, iv) Minimum Work-in-process Inventory. Results demonstrated that CP-2 presented best results on criteria i and ii, but MIP was superior on criteria iii and iv and those findings are discussed at the final section of this work.
Cite
CITATION STYLE
Oliveira, R. M. e S. de, & Ribeiro, M. S. F. O. de C. (2015). Comparing Mixed & Integer Programming vs. Constraint Programming by solving Job-Shop Scheduling Problems. Independent Journal of Management & Production, 6(1). https://doi.org/10.14807/ijmp.v6i1.262
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.