A systematic review of construction and demolition waste management in Australia: Current practices and challenges

71Citations
Citations of this article
240Readers
Mendeley users who have this article in their library.

Abstract

Construction and demolition waste (C&DW) has a deleterious impacts on sustainability not only in developing countries but also in developed nations. For example, Australia generated more than 27 million tonnes of C&DW in 2018–2019; however, only 60% of this waste stream was recovered. Considering this low recovery rate, lower than many developed nations, and with regards to the increasing rate of C&DW generation, extra attention should be given to the construction and demolition waste management (C&DWM) in Australia. Therefore, this research attempts to accurately understand the current practices and challenges of C&DWM in Australia. To do so, primarily, a systematic review of studies relevant to C&DWM from 2010 to 2021 was performed. In this step, 26 research documents were meticulously analysed to identify the current practices of C&DWM in Australia. Then, an in-depth interview with three experts were undertaken to verify the major results and to investigate the challenges of C&DWM in Australia. The results indicated that three factors significantly affect C&DWM in Australia, namely attitudes and behaviour of C&DWM stakeholders, C&DWM in project life cycles, and C&DWM regulations with regards to sustainability, adding that the latter was revealed as the most effective in C&DWM in Australia.

Cite

CITATION STYLE

APA

Kabirifar, K., Mojtahedi, M., & Wang, C. C. (2021, May 22). A systematic review of construction and demolition waste management in Australia: Current practices and challenges. Recycling. MDPI AG. https://doi.org/10.3390/recycling6020034

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free