Study on the optimization strategy of offshore wind power

6Citations
Citations of this article
15Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

Offshore wind power is considered a promising renewable energy source; unfortunately, its weighted average levelized cost of electricity is still too high to compete with renewable energies such as photovoltaics. This is in large part due to the high construction cost of offshore wind power, even though it has fallen substantially with technological advances and the accumulation of experience. This paper optimizes the cost from two aspects. Because large-scale wind farms have better bargaining and scheduling power, we analyse in detail the relationship between the cost of different key components and the scale of the wind farm, and if the decommissioned wind farm chooses to repower, costs such as cables and foundations can be saved, which can further reduce the costs. Our studies show that compared with a 400-MW offshore wind farm, 1000 MW can reduce the unit cost by 10.3%, and its cost is 13 239 RMB/kW. If repowering is chosen, there is a further reduction of 28.6%, and its cost is 9450 RMB/kW. We recommend using larger offshore wind farms and choosing repowering after they are decommissioned to get better economics.

Cite

CITATION STYLE

APA

Wang, J., Wei, X., & Juanatas, R. (2023). Study on the optimization strategy of offshore wind power. International Journal of Low-Carbon Technologies, 18, 367–372. https://doi.org/10.1093/ijlct/ctad024

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free