The performance evaluation of the spare parts management: Case study

2Citations
Citations of this article
40Readers
Mendeley users who have this article in their library.

Abstract

The supply chain of spare parts is the intersection between the supply chain, the after-sales and the maintenance services. Some authors have tried to define improvement paths in terms of models to satisfy the performance criteria. In addition, other authors are directed towards the integration of risk management in the demand forecasting and the stock management (performance evaluation) through probabilistic models. Among these models, the probabilistic graphical models are the most used, for example, Bayesian networks and petri nets. Performance evaluation is done through performance indicators. To measure the appreciation of the supply of the spare parts stock, this paper focuses on the performance evaluation of the system by petri nets. This evaluation will be done through an analytical study. The purpose of this study is to evaluate and analyze the performance of the system by proposed indicators. First, we present a literature review on Petri nets which is the essential tool in our modeling. Secondly, we present in the third section the analytical study of the model based on bath deterministic and stochastic petri networks. Finally, we present an analysis of the proposed model compared to the existing ones.

Cite

CITATION STYLE

APA

Oumaima, B., Barkany, A. E., & Biyaali, A. E. (2019). The performance evaluation of the spare parts management: Case study. Management and Production Engineering Review, 10(2), 37–49. https://doi.org/10.24425/mper.2019.129567

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free