Applied Mathematical Model for Construction Planning in a Housing Development Project

  • Ngowtanasuwan G
N/ACitations
Citations of this article
4Readers
Mendeley users who have this article in their library.

Abstract

The paper presented a method for solving a construction planning problem in a housing development project using a mathematical model which is an integer linear programming for dividing house construction jobs to three contractors in a project case study. 169 units of the houses in the project would be constructed by the three contractors in two methods, conventional construction method and precast method. The results found a minimum construction cost of the project was 417.69 million baht (M$13.92), and within the total project duration of 72 months. Conclusions and recommendations were discussed in this article.Keywords: Housing Development Project, Mathematical Model, Precast Concrete Construction.eISSN 2398-4295 © 2018. The Authors. Published for AMER ABRA cE-Bs by e-International Publishing House, Ltd., UK. This is an open-access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). Peer–review under responsibility of AMER (Association of Malaysian Environment-Behaviour Researchers), ABRA (Association of Behavioural Researchers on Asians) and cE-Bs (Centre for Environment-Behaviour Studies), Faculty of Architecture, Planning & Surveying, Universiti Teknologi MARA, Malaysia. DOI: http://dx.doi.org/10.21834/ajbes.v3i13.140

Cite

CITATION STYLE

APA

Ngowtanasuwan, G. (2018). Applied Mathematical Model for Construction Planning in a Housing Development Project. Asian Journal of Behavioural Studies, 3(13), 22. https://doi.org/10.21834/ajbes.v3i13.140

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free