In order to improve the utilisation rate of renewable energy and flexibility of the system, the AC-DC distributionnetwork with multiple park integrated energy subnetwork (PIESN) based on multi-port power electronic transformer (MPPET) isproposed. First, a power-sharing model of interconnected PIESNs based on MPPET is built, in which the port power of MPPETcan be controlled. Then the flexibility demand and supply of electricity, heat and cooling are analysed and a flexibility-sharingmodel among multi-PIESN is established. Multi-energy flexibility conversion mechanism is proposed and the flexibility index isestablished. Moreover, the optimal operation problem is formulated and solved. The objective function is the comprehensiveoperation cost, which includes generation cost, energy cost of PIESN, network loss cost, MPPET loss cost, carbon emissioncost and electricity storage system operation cost. Finally, simulation on the modified IEEE33 system shows that the proposedmodel can make the system be in an adequate flexibility, improve the utilisation rate of renewable energy, reduce load sheddingand realise the power sharing among multi-PIESNs.
CITATION STYLE
Geng, Q., Hu, Y., He, J., Zhou, Y., Zhao, W., Xu, X., & Wei, W. (2020). Optimal operation of AC-DC distribution network with multi park integrated energy subnetworks considering flexibility. IET Renewable Power Generation, 14(6), 1004–1019. https://doi.org/10.1049/iet-rpg.2019.0862
Mendeley helps you to discover research relevant for your work.