Enhanced Optimization Strategies for No-Wait Flow Shop Scheduling with Sequence-Dependent Setup Times: A Hybrid NEH-GRASP Approach for Minimizing the Total Weighted Flow Time and Energy Cost

2Citations
Citations of this article
6Readers
Mendeley users who have this article in their library.
Get full text

Abstract

Efficient production scheduling is a key challenge in industrial operations and continues to attract significant interest within the field of operations research. This paper investigates a range of methodological approaches designed to solve the permutation flow shop scheduling problem (PFSP) with sequence-dependent setup times (SDST). The main objective is to minimize the total weighted flow time (TWFT) while ensuring a no-wait production environment. The proposed solution strategy is based on using algorithms with a mixed integer linear programming (MILP) formulation, heuristics, and their combination. The heuristics utilized in this paper include an advanced greedy randomized adaptive search procedure (GRASP) based on a priority rule and Hybrid-GRASP-NEH (HGRASP), where Nawaz-Enscore-Ham (NEH) takes place to initiate solutions, based on iterative global and local search methods to refine exploration capabilities and improve solution quality. These approaches were validated using a comprehensive set of experiments across diverse instance sizes that proved the efficiency of HGRASP, with the results showing a high-performance level that closely matched that of the exact MILP approach. Statistical analysis via the Friedman test (χ2 = 46.75, p = 7.04 × 10−11) confirmed significant performance differences among MILP, GRASP, and HGRASP. While MILP guarantees theoretical optimality, its practical effectiveness was limited by imposed computational time constraints, and HGRASP consistently achieved near-optimal solutions with superior computational efficiency, as demonstrated across diverse instance sizes.

Cite

CITATION STYLE

APA

Mimouni, H., Jalid, A., & Aqil, S. (2025). Enhanced Optimization Strategies for No-Wait Flow Shop Scheduling with Sequence-Dependent Setup Times: A Hybrid NEH-GRASP Approach for Minimizing the Total Weighted Flow Time and Energy Cost. Sustainability (Switzerland), 17(17). https://doi.org/10.3390/su17177599

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free