A two-stage approach to the depot shunting driver assignment problem with workload balance considerations

7Citations
Citations of this article
23Readers
Mendeley users who have this article in their library.

Abstract

Due to its environmentally sustainable and energy-saving characteristics, railway transportation nowadays plays a fundamental role in delivering passengers and goods. Emerged in the area of transportation planning, the crew (workforce) sizing problem and the crew scheduling problem have been attached great importance by the railway industry and the scientific community. In this paper, we aim to solve the two problems by proposing a novel twostage optimization approach in the context of the electric multiple units (EMU) depot shunting driver assignment problem. Given a predefined depot shunting schedule, the first stage of the approach focuses on determining an optimal size of shunting drivers. While the second stage is formulated as a bi-objective optimization model, in which we comprehensively consider the objectives of minimizing the total walking distance and maximizing the workload balance. Then we combine the normalized normal constraint method with a modified Pareto filter algorithm to obtain Pareto solutions for the bi-objective optimization problem. Furthermore, we conduct a series of numerical experiments to demonstrate the proposed approach. Based on the computational results, the regression analysis yield a driver size predictor and the sensitivity analysis give some interesting insights that are useful for decision makers.

Cite

CITATION STYLE

APA

Wang, J., Gronalt, M., & Sun, Y. (2017). A two-stage approach to the depot shunting driver assignment problem with workload balance considerations. PLoS ONE, 12(7). https://doi.org/10.1371/journal.pone.0181165

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free