Abstract
The coordination of systems or specialties in the development of construction projects identifies problems of spatial conception between the different engineering departments, but many projects do not carry out this procedure before their physical construction, do not develop collaborative processes and do not implement new improvement methodologies. For this reason, this research focuses on presenting the amount of incompatibilities and interferences that are determined through coordination through the forecast of the BIM (Building Information Modeling) methodology and how this impacts the forecast budget. The research is mainly based on the modeling and coordination of the different engineering, starting with the organization of the project's native CAD (Computer-Aided Design) information and its transition, as a basis towards BIM (Building Information Modeling), thus achieving the change from the 2D world to the 3D one, being able to easily identify incompatibilities and interferences. The results of the coordination determine the increase in the initial budget of the project by 2.84%, this under the use of criteria for the solution of incompatibilities and interferences of the different engineering in the design stage, since in a construction stage this percentage would increase. for the use of its resources.
Author supplied keywords
Cite
CITATION STYLE
Ocas, J. C. Y., Hoyos, D. Z., & Sarmiento, A. E. A. (2022). Application of the BIM Methodology for the Coordination and Identification of Percentage Variation in the Budget of the Commercial Building. In Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology (Vol. 2022-July). Latin American and Caribbean Consortium of Engineering Institutions. https://doi.org/10.18687/LACCEI2022.1.1.67
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.