Bottlenecks with Respect to Due-Time Performance in Pull Serial Production Lines

28Citations
Citations of this article
14Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

In this work, serial production lines with finished goods buffers operating in the pull regime are considered. The machines are assumed to obey Bernoulli reliability model. The problem of satisfying customers demand is addressed. The level of demand satisfaction is quantified by the due-time performance (DTP), which is defined as the probability to ship to the customer a required number of parts during a fixed time interval. Within this scenario, the definitions of DTP bottlenecks are introduced and a method for their iden-tification is developed.

Cite

CITATION STYLE

APA

Li, J., & Meerkov, S. M. (2000). Bottlenecks with Respect to Due-Time Performance in Pull Serial Production Lines. Mathematical Problems in Engineering, 5(6), 479–498. https://doi.org/10.1155/S1024123X99001209

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free