Solving realistic unit commitment problems using temporal planning: Challenges and solutions

7Citations
Citations of this article
8Readers
Mendeley users who have this article in their library.

Abstract

When facing real world planning problems, standard planners are often inadequate and enhancement of the current techniques are required. In this paper we present the challenges that we have faced in solving the Unit Commitment (UC) problem, a well-known problem in the electrical power industry for which current best methods are based on Mixed Integer Programming (MIP). Typical UC instances involve hundreds or even thousands of generating units, pushing the scalability of state of the art planners beyond their limits. Furthermore, UC is characterised by state-dependent action costs, a feature that not many domain independent planners can efficiently handle. In this paper we focus on the challenge of making domainindependent planning competitive with the MIP method on realistic-sized UC instances. We present the results of our investigation into modelling the UC problem as a temporal planning problem, and show how we scaled up from handling fewer than 10 generating units to more than 400, obtaining solutions almost as high quality as those generated by MIP. We conclude by discussing future directions for temporal planning in this domain, that lie beyond what can be modelled and solved using MIP methods.

Cite

CITATION STYLE

APA

Piacentini, C., Magazzeni, D., Long, D., Fox, M., & Dent, C. (2016). Solving realistic unit commitment problems using temporal planning: Challenges and solutions. In Proceedings International Conference on Automated Planning and Scheduling, ICAPS (Vol. 2016-January, pp. 421–430). Association for the Advancement of Artificial Intelligence. https://doi.org/10.1609/icaps.v26i1.13777

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free