Testing of a novel IFAS-MBR process with co-precipitation

2Citations
Citations of this article
12Readers
Mendeley users who have this article in their library.

Abstract

IFAS-MBR with co-precipitation, not yet commonly used in practice, will result in a very compact process for nutrient removal. The process, based on a combined pre-and post-denitrification IFAS process with membrane separation (IFAS-MBR), was tested in two parallel small-scale plants. Train A was operated with co-precipitation in order to achieve high removal of total P (TP). Train B, without co-precipitation, served as a control. Due to the coagulant (Al) addition, the concern was precipitation on the biofilm carriers in the aerobic reactor in Train A. A small internal air-lift pump proved to be very efficient in controlling biofilm thickness and removing excess biofilm mass as needed. A coagulant dose equivalent to an Al/TP molar ratio of 1.9 was necessary to achieve 99% TP removal and 0.10 mg TP/l in the effluent of Train A. Very good removal of total N was achieved in both trains. Train A had a biofilm nitrification rate of 0.65 g NH4-N/m2d at 12–13 °C and 5.2–5.6 mg O2/l. The tests demonstrated that an IFAS-MBR process with co-precipitation and an aerobic suspended biomass SRT of 5–10 days is feasible, and that all the performance goals set up for the full-scale plant were achieved.

Cite

CITATION STYLE

APA

Rusten, B., Rathnaweera, S. S., Manamperuma, L. D., Kjeverud, M., & Ødegaard, H. (2021). Testing of a novel IFAS-MBR process with co-precipitation. Water Practice and Technology, 16(4), 1091–1107. https://doi.org/10.2166/wpt.2021.054

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free