Abstract
This paper reviews the available methods for prestressed-steel concrete slab bridge construction, discusses advantages and disadvantages of the method of construction, and presents some test results concerning shrinkage, creep and fatigue of a prestressed-steel concrete slab bridge unit.
Cite
CITATION STYLE
APA
Densford, T. A., Hendrick, T. L., & Murray, T. M. (1991). Short span prestressed steel bridges. Engineering Journal, 27(3), 114–120. https://doi.org/10.62913/engj.v27i3.550
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.
Already have an account? Sign in
Sign up for free