Hybrid Monte Carlo tree search based multi-objective scheduling

13Citations
Citations of this article
19Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

As markets demand targeted products for highly differentiated use cases, the number of variants in production increases, whilst the volume per variant decreases. Different product variants result in differences in work content on workstation level which cause takt time losses and result in a poor utilization. In this context, matrix-structured production systems with neither temporal nor spacial linkage emerged to reduce the effects of different work content on the entire production system. However, matrix-structured production systems require far more complex production control. To that end, this paper presents a scheduling approach. The proposed scheduling system considers variable process sequences and their allocation to different workstations in order to optimize scheduling objectives. This contribution presents a Monte Carlo tree search based optimizer combined with local search as post optimizer to derive schedules in a short time span to enabling reactive scheduling. The application of the scheduler to a benchmark problem and an industrial scheduling problem demonstrates the quality of the results and illustrates how the scheduler reassigns the work content dynamically.

Cite

CITATION STYLE

APA

Hofmann, C., Liu, X., May, M., & Lanza, G. (2023). Hybrid Monte Carlo tree search based multi-objective scheduling. Production Engineering, 17(1), 133–144. https://doi.org/10.1007/s11740-022-01152-9

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free