PENERAPAN BUILDING INFORMATION MODELLING (BIM) PADA PROYEK PASAR SOREANG KABUPATEN BANDUNG

  • Gunawan M
N/ACitations
Citations of this article
89Readers
Mendeley users who have this article in their library.

Abstract

The application of BIM in the Soreang Market development project, Bandung Regency using the Tekla Structure application. How is the time performance in the implementation of the Pasar Soreang project, Bandung Regency. Applying BIM to 4-dimensional (4D) modeling in the construction of the Soreang market project in Bandung Regency. Analyzing project time performance in the form of deviation of realization weight with plan weight based on s curve.Research method is basically a scientific way to get data with a specific purpose and use. Based on the statement above, it can be seen that in a study using a method of processing data and drawing conclusions related to the problem in the study.District afternoon market project. Bandung uses Tekal Structure 19 software. With 3D modeling of buildings in the form of piles, pile caps, tie beams, columns, beams, plates and roof coverings. Then the schedule is added so that it becomes a 4D modeling using the task manager in the Tekla Structure application. In the 4D modeling obtained in the form of images that are able to present the work step by step according to the schedule. The importance of surveys related to traffic conditions around the project site in order to be able to engineer traffic flow so as not to hinder the mobilization of project materials.

Cite

CITATION STYLE

APA

Gunawan, M. (2021). PENERAPAN BUILDING INFORMATION MODELLING (BIM) PADA PROYEK PASAR SOREANG KABUPATEN BANDUNG. Jurnal Student Teknik Sipil, 3(2), 407–420. https://doi.org/10.37150/jsts.v3i2.1655

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free