Cost of industrial process shutdowns due to voltage sag and short interruption

23Citations
Citations of this article
35Readers
Mendeley users who have this article in their library.

Abstract

The objective of this work is to propose and apply a methodology to obtain the cost of industrial process shutdowns due to voltage sag and short interruption. A field survey, aided by a specific questionnaire, was carried out in several industries connected to medium voltage networks, in the states of Espírito Santo and São Paulo in Brazil. The results obtained were the costs per event and the costs per demand in a total of 33 companies in 12 different types of activities. It is noteworthy that this survey brings a relevant technical contribution to the electricity sector, helping to fill, even partially, an existing gap in both national and international literature.

Cite

CITATION STYLE

APA

Motoki, É. M., Filho, J. M. de C., da Silveira, P. M., Pereira, N. B., & de Souza, P. V. G. (2021). Cost of industrial process shutdowns due to voltage sag and short interruption. Energies, 14(10). https://doi.org/10.3390/en14102874

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley