PSO and simulated annealing for the two-machine flowshop scheduling problem with coupled-operations

15Citations
Citations of this article
6Readers
Mendeley users who have this article in their library.
Get full text

Abstract

In this paper, we proposed an hybrid algorithm combining particle swarm optimisation with the simulated annealing (PSO-SA) to solve the flowshop problem with coupled-operations in the presence of the time lags. The criterion to minimise is the makespan. To verify the performance of the hybridised algorithm, computational experiments are performed and the obtained results are compared with the simulated annealing and PSO algorithms. However, the experimental results show that the PSO-SA performs better than the others approaches.

Cite

CITATION STYLE

APA

Meziani, N., Boudhar, M., & Oulamara, A. (2018). PSO and simulated annealing for the two-machine flowshop scheduling problem with coupled-operations. European Journal of Industrial Engineering, 12(1), 43–66. https://doi.org/10.1504/EJIE.2018.089877

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free