Solving a log-truck scheduling problem with constraint programming

7Citations
Citations of this article
10Readers
Mendeley users who have this article in their library.
Get full text

Abstract

Scheduling problems in the forest industry have received significant attention in the recent years and have contributed many challenging applications for optimization technologies. This paper proposes a solution method based on constraint programming and mathematical programming for a log-truck scheduling problem. The problem consists of scheduling the transportation of logs between forest areas and woodmills, as well as routing the fleet of vehicles to satisfy these transportation requests. The objective is to minimize the total cost of non-productive activities such as waiting time of trucks and forest log-loaders and the empty driven distance of vehicles. We propose a constraint programming model to address the combined scheduling and routing problem and an integer programming model to deal with the optimization of deadheads. © 2008 Springer-Verlag Berlin Heidelberg.

Cite

CITATION STYLE

APA

El Hachemi, N., Gendreau, M., & Rousseau, L. M. (2008). Solving a log-truck scheduling problem with constraint programming. In Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics) (Vol. 5015 LNCS, pp. 293–297). https://doi.org/10.1007/978-3-540-68155-7_25

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free