Abstract
In the construction of the D-runway in Tokyo International Airport (Haneda Airport), "the settlement prediction and management system (HSAP)" which can efficiently evaluate the consolidation settlement of artificial reclamation was developed. The reclamation history data base which reflected the actual construction until July, 2009 and the reclamation plan after that was made. The actual measurement and the calculation value were compared and the various consolidation parameters were identified. Moreover, the long-term consolidation test and constant strain rate onsolidation test were executed, and the secondary consolidation parameter was set based on the isotache model's concept. Based on the prediction result of the residual consolidation settlement, the filling height of the D-runway at the start of in-service period was decided to be 0.70m, which is required from the aviation operation. © 2012 The Society of Materials Science, Japan.
Author supplied keywords
Cite
CITATION STYLE
Mizuno, K., Watabe, Y., Kobayashi, M., Noguchi, T., Aoki, Y., Yamamoto, T., & Takahashi, M. (2012). Long-term consolidation settlement prediction of d-runway in tokyo international airport. Zairyo/Journal of the Society of Materials Science, Japan, 61(1), 78–84. https://doi.org/10.2472/jsms.61.78
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.