Culvert versus Bridge Hydraulics for Larger-Span or Short Culverts

  • Lyn D
  • Dey S
  • Saksena S
  • et al.
2Citations
Citations of this article
9Readers
Mendeley users who have this article in their library.
Get full text

Abstract

A bridge versus culvert hydraulics approach may be taken to estimate the headwater of larger-span (or equivalently short) culvert-like structures, and design manuals often argue that the former should be technically preferred. A laboratory study was undertaken to investigate short and long box culverts, including roughness effects, with special attention paid to short-structure cases with entirely open-channel flow. The data were analyzed using discharge coefficients and approximate analytical models. Simulations were conducted with the HEC-RAS bridge model (with mainly default or recommended parameter values and options) and HY-8 to assess the predictive performance and benefits, if any, of a bridge versus culvert hydraulics approach. Observations support the presence of shortness and roughness effects, but do not support any significant advantage of a bridge versus culvert hydraulics approach. On the contrary, the performance of HY-8 was found to be superior to that of the HEC-RAS bridge model for rough-bed cases, perhaps fortuitously, due to its often conservative choice of parameter values.

Cite

CITATION STYLE

APA

Lyn, D. A., Dey, S., Saksena, S., & Merwade, V. M. (2024). Culvert versus Bridge Hydraulics for Larger-Span or Short Culverts. Journal of Hydraulic Engineering, 150(2). https://doi.org/10.1061/jhend8.hyeng-13650

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free