PERENCANAAN JEMBATAN CABLE STAYED 200 METER (Studi Kasus : Jembatan Cijambe Garut)

  • Janizar S
  • Habdullah H
  • Setiawan F
  • et al.
N/ACitations
Citations of this article
40Readers
Mendeley users who have this article in their library.

Abstract

In this final project, we discuss the Planning of a Cable Stayed Bridge with a Length of 200 meters. This bridge has a length of 200 meters with a span of 180 meters and an edge span of 20 meters. The bridge cable configuration uses a semi harp pattern with a two planes system cable position. The bridge has a vehicle floor width of 6.00 meters, and a sidewalk of 1.5 meters right and left. As for the results of this design, the secondary structure of the bridge consists of railings with a hollow steel profile with a diameter of 60.5, curbs with a thickness of 250 mm, a vehicle floor plate with a thickness of 200 mm concrete slab and 50 mm asphalt, and a girder consisting of a WF 1300,550 transverse girder. 28.34, longitudinal girder WF 600.200.11.17, and cantilever girder WF 300.150.6.5.9 for the connection of the girder itself using a simple connection with an L elbow plate. While the main structure consists of the main girder using rectangular twin box girders with dimensions of 2500.1500.50.50, then stay cable is made up of 7 – wire strands with a diameter of 15.2 mm and a pylon which is designed using reinforced concrete material with dimensions of 4000 mm x 3000 mm with a cavity inside.

Cite

CITATION STYLE

APA

Janizar, S., Habdullah, H., Setiawan, F., & Ampearawan Schipper, L. (2022). PERENCANAAN JEMBATAN CABLE STAYED 200 METER (Studi Kasus : Jembatan Cijambe Garut). JURNAL TEKNIK SIPIL CENDEKIA (JTSC), 3(1), 43–59. https://doi.org/10.51988/jtsc.v3i1.45

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free