Estimation of Break Outflow from the Goeyeon Reservoir Using DAMBRK Model

  • Lee J
  • Park D
  • Kim S
  • et al.
N/ACitations
Citations of this article
5Readers
Mendeley users who have this article in their library.

Abstract

Several reservoirs that were managed by local governments and the Korea Rural Community Corporation have recently collapsed. One of them is the Goeyeon reservoir in Yeongcheon-si, Gyeongsangbuk-do that collapsed mainly around the spillway due to heavy rain at 9 O’clock, on 21 August 2014. The Goeyeon reservoir was an aging agricultural reservoir over 70 years since it was built. In this study, the collapse situation of the reservoir was reproduced through the DAMBRK model. Flood inundation maps were reconstructed for the breach outflow of the dam analyzed by the DAMBRK model. We estimated the breach duration and outflow of the reservoir as compared with the inundation image taken by the Unmanned Aerial Vehicle (UAV) at the time when the Goeyeon reservoir collapsed. The results of this study are expected to be useful for predicting damage in the downstream inundation area when a reservoir collapses.

Cite

CITATION STYLE

APA

Lee, J. Y., Park, D. H., Kim, S.-J., & Kim, T.-W. (2017). Estimation of Break Outflow from the Goeyeon Reservoir Using DAMBRK Model. Journal of The Korean Society of Civil Engineers, 37(2), 459–466. https://doi.org/10.12652/ksce.2017.37.2.0459

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free