Key results of long pulse ICRH operation in Tore Supra

52Citations
Citations of this article
16Readers
Mendeley users who have this article in their library.

Abstract

Long pulse operation on the Tore Supra tokamak has entered a new phase, characterized by the use of heating power level in excess of 10 MW, during pulses lasting several tens of resistive times. This has been made possible by the use of ion cyclotron range of frequency (ICRF) heating (9 MW coupled to the plasma at 57 MHz), combined with lower hybrid current drive (LHCD: 3 MW at 3.7 GHz) and efficient fuelling techniques (supersonic gas injection, pellets). This paper addresses key technological, operational and physics issues related to the long pulse operation of the Tore Supra ICRF system and required for a reactor: R&D on the ICRF plant, real-time control and safety procedures, integration with other tokamak subsystems, experimental investigation and theoretical modelling of the edge ICRF physics (wave coupling, heat loads on antenna front faces). As far as possible lessons are drawn from the experience gained on Tore Supra for the design and operation of a next-step device. © 2006 IAEA.

Cite

CITATION STYLE

APA

Colas, L., Basiuk, V., Beaumont, B., Bécoulet, A., Bosia, G., Brémond, S., … Vulliez, K. (2006). Key results of long pulse ICRH operation in Tore Supra. In Nuclear Fusion (Vol. 46). https://doi.org/10.1088/0029-5515/46/7/S11

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free