Abstract
This study aims to evaluate via a case study the process in establishing post-construction performance goals and their perceived impact to a design and construction project team’s culture. Performance goals were established from an iterative quantitative approach, while the impact to the design and construction team were evaluated by a qualitative method. Preliminary results appear to indicate a likely positive impact to a project team’s culture, level of effort, and trust. Specifically, results may indicate a net positive impact from unambiguous post-construction performance goals to a project team’s perception of its communication and overall project environment, reduction in traditional sources of process waste, and a positive impact to elements associated with cost, schedule, and quality.
Author supplied keywords
Cite
CITATION STYLE
Mulholland, S. M., Banasiak, M., Clevenger, C. M., Staton, J., & Brown, Q. (2022). ESTABLISHING DESIGN METRICS TO INFORM DESIGN CHANGE, INCREASE PROJECT TEAM COMMUNICATION, AND REDUCE WASTE: A HEALTHCARE CASE STUDY. In 30th Annual Conference of the International Group for Lean Construction, IGLC 2022 (pp. 1134–1143). The International Group for Lean Construction. https://doi.org/10.24928/2022/0223
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.