A Mixed Algorithm for Integrated Scheduling Optimization in AS/RS and Hybrid Flowshop

13Citations
Citations of this article
20Readers
Mendeley users who have this article in their library.

Abstract

The integrated scheduling problem in automated storage and retrieval systems (AS/RS) and the hybrid flowshop is critical for the realization of lean logistics and just-in-time distribution in manufacturing systems. The bi-objective model that minimizes the operation time in AS/RS and the makespan in the hybrid flowshop is established to optimize the problem. A mixed algorithm, named GA-MBO algorithm, is proposed to solve the model, which combines the advantages of the strong global optimization ability of genetic algorithm (GA) and the strong local search ability of migratory birds optimization (MBO). To avoid useless solutions, different cross operations of storage and retrieval tasks are designed. Compared with three algorithms, including improved genetic algorithm, improved particle swam optimization, and a hybrid algorithm of GA and particle swam optimization, the experimental results showed that the GA-MBO algorithm improves the operation efficiency by 9.48%, 19.54%, and 5.12% and the algorithm robustness by 35.16%, 54.42%, and 39.38%, respectively, which further verified the effectiveness of the proposed algorithm. The comparative analysis of the bi-objective experimental results fully reflects the superiority of integrated scheduling optimization.

Cite

CITATION STYLE

APA

Lu, J., Xu, L., Jin, J., & Shao, Y. (2022). A Mixed Algorithm for Integrated Scheduling Optimization in AS/RS and Hybrid Flowshop. Energies, 15(20). https://doi.org/10.3390/en15207558

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free