Research on Multi-Objective Flexible Job Shop Scheduling Optimization Based on Improved Salp Swarm Algorithm in Rolling Production Mode

4Citations
Citations of this article
4Readers
Mendeley users who have this article in their library.

Abstract

To address the multi-objective flexible job shop scheduling problem in rolling production mode (FJSP-RPM), this study proposes a Multi Objective Improved of Salp Swarm Algorithm (MISSA) that simultaneously optimizes equipment utilization and total tardiness. The MISSA generates initial population through various heuristic strategies to improve the initial population quality. The exploitation capability of the algorithm is enhanced through the global crossover strategy and variety of local search strategies. In terms of improvement strategies, the MISSA (using all three strategies) outperforms other incomplete variant algorithms (using only two strategies) in three metrics: Generational Distance (GD), Inverted Generational Distance (IGD), and diversity metric, achieving superior results in 9 test cases, 8 test cases, and 4 test cases respectively. When compared with NSGA2, NSGA3, and SPEA2 algorithms, the MISSA demonstrates advantages in 8 test cases for GD, 8 test cases for IGD, and 7 test cases for the diversity metric. Additionally, the distribution of the obtained solution sets is significantly better than that of the comparative algorithms, which validats the effectiveness of the MISSA in solving FJSP-RPM.

Cite

CITATION STYLE

APA

Yin, L., & Gao, Q. (2025). Research on Multi-Objective Flexible Job Shop Scheduling Optimization Based on Improved Salp Swarm Algorithm in Rolling Production Mode. Applied Sciences (Switzerland), 15(11). https://doi.org/10.3390/app15115947

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free