Aproximación a la gestión económica integral de las obras por procesos productivos: Elaboración del modelo COP de control de costes de construcción

2Citations
Citations of this article
18Readers
Mendeley users who have this article in their library.

Abstract

The deep economic crisis recently undergone in Spain has highlighted the vulnerability of the Construction Industry and the necessity of the development of new tools to increase its efficiency. Focusing on the economic dimension of building works, a pressing and growing problem is the significant deviation identified among estimates and real building costs. In order to solve this failure, a model for building cost control based on production processes is proposed, the COP model. This model extrapolates the approach of the model for estimating building construction costs by processes, the POP model, to the phase of monitoring and economic control of building construction works. Therefore, the combined implementation of both models, POP and COP, provides an efficient and comprehensive economic management of building works by accurately adjusting to their planning and development and facilitating the effective identification of deviations and adoption of corrective measures to settle the mistakes detected.

Cite

CITATION STYLE

APA

Montes, M. V., Ponce, M. E., Falcón, R. M., & Ramírez-de-Arellano, A. (2017). Aproximación a la gestión económica integral de las obras por procesos productivos: Elaboración del modelo COP de control de costes de construcción. Informes de La Construccion, 69(548), 1–11. https://doi.org/10.3989/ic.16.121

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free