Subseasonal-to-Seasonal Forecasting for Wind Turbine Maintenance Scheduling

7Citations
Citations of this article
11Readers
Mendeley users who have this article in their library.

Abstract

Certain wind turbine maintenance tasks require specialist equipment, such as a large crane for heavy lift operations. Equipment hire often has a lead time of several weeks but equipment use is restricted by future weather conditions through wind speed safety limits, necessitating an assessment of future weather conditions. This paper sets out a methodology for producing subseasonal-to-seasonal (up to 6 weeks ahead) forecasts that are site- and task-specific. Forecasts are shown to improve on climatology at all sites, with fair skill out to six weeks for both variability and weather window forecasts. For the case of crane hire, a cost-loss model identifies the range of electricity prices where the hiring decision is sensitive to the forecasts. While there is little difference in the hiring decision made by the proposed forecasts and the climatology benchmark at most electricity prices, the repair cost per turbine is reduced at lower electricity prices.

Cite

CITATION STYLE

APA

Tawn, R., Browell, J., & McMillan, D. (2022). Subseasonal-to-Seasonal Forecasting for Wind Turbine Maintenance Scheduling. Wind, 2(2), 260–287. https://doi.org/10.3390/wind2020015

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free