Multi objective transmission network expansion planning considering wind power uncertainty and scenario reduction

0Citations
Citations of this article
5Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

Under the background of large-scale new energy grid connection, the selection of grid connection point affects the grid structure to be expanded. The intermittence of wind power and the correlation with load also affect the voltage and line safety of each node in the grid. In order to accurately describe the uncertainty factors such as wind power output, multi scenario stochastic simulation technology and reduction method are used to establish multi scenario to accurately describe multi-point wind power and load uncertainty; At the same time, a multi-objective transmission network expansion planning model considering the cost of investment, operation and reliability is established. The effectiveness of the model is verified by IEEE 30 bus simulation. It shows that the accuracy and rationality of transmission network expansion planning can be improved by scenario reduction.

Cite

CITATION STYLE

APA

Piao, Z. Y., Chen, M. Y., Li, S. Q., & Li, H. Y. (2020). Multi objective transmission network expansion planning considering wind power uncertainty and scenario reduction. In Journal of Physics: Conference Series (Vol. 1639). IOP Publishing Ltd. https://doi.org/10.1088/1742-6596/1639/1/012048

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free