Performance verification of pipe-embedded wall system in school building and proposal of its optimal control strategy

2Citations
Citations of this article
5Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

In this study, a thermally activated building system (TABS) installed on the exterior wall as the pipe-embedded wall (PEW) system in a school building was investigated. The basic performance of the PEW system utilizing well water cascade is verified by unsteady CFD analysis and field measurements. Moreover, in order to improve the utilization efficiency of the thermal potential from well water, the MPC-based optimal control method with the PEW system to maximize the heat extraction is proposed and verified by unsteady CFD analysis. The analysis results showed that: (1) The PEW system can reduce the peak load from the exterior wall facing different directions at different times. In addition, the PEW system has the effect of stabilizing the indoor thermal environment. (2) The proposed optimal operation strategy improves the energy efficiency, extracting up to 30% more heat and reducing the total heat transmission, which significantly develops the operation efficiency of the PEW system.

Cite

CITATION STYLE

APA

Huang, M., Shiraishi, Y., Hirakawa, S., & Maruyama, J. (2024). Performance verification of pipe-embedded wall system in school building and proposal of its optimal control strategy. Japan Architectural Review, 7(1). https://doi.org/10.1002/2475-8876.12447

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free