Prediction of Overoptimistic Predictions

3Citations
Citations of this article
10Readers
Mendeley users who have this article in their library.

Abstract

Overoptimistic predictions are common in software engineering projects, e.g., the average software project cost overrun is about 30%. This paper examines the use of two popular general tests of optimism (the ASQ and the LOT-R test) to select software engineers that are less likely to provide overoptimistic predictions. A necessary, but not sufficient, condition for this use is that there is a strong relationship between optimism score, as measured by the ASQ and LOT-R tests, and predictions. We report from two experiments on this topic. The experiments suggest that the relation between optimism score as measured by ASQ or LOT-R and predictions is too weak to enable a use of these optimism measurement instruments to select more realistic estimators in software organizations. Our results also suggest that a person’s general level of optimism and over-optimistic predictions of performance are, to a large extent, unrelated.

Author supplied keywords

Cite

CITATION STYLE

APA

Jørgensen, M., & Faugli, B. (2006). Prediction of Overoptimistic Predictions. In 10th International Conference on Evaluation and Assessment in Software Engineering, EASE 2006. BCS Learning and Development Ltd. https://doi.org/10.14236/ewic/EASE2006.5

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free