Scheduling copper refining and casting operations by means of heuristics for the flexible flow shop problem

4Citations
Citations of this article
7Readers
Mendeley users who have this article in their library.

Abstract

Management of the operations in a copper smelter is fundamental for optimizing the use of the plant's installed capacity. In the refining and casting stage, the operations are particularly complex due to the metallurgical characteristics of the process. This paper tackles the problem of automatic scheduling of operations in the refining and casting stage of a copper concentrate smelter. The problem is transformed into a flexible flow shop problem and to solve it, an iterative method is proposed that operates in two stages: in the first stage, a sequence of jobs is constructed that configures the lots, and in the second, the constructed solution is improved by means of simulated annealing. Fifteen test problems are used to show that the proposed algorithm improves the makespan by an average of 9.42% and the mean flow time by 12.19% with respect to an existing constructive heuristic. © 2011 Bralizian Operations Research Society.

Cite

CITATION STYLE

APA

Pradenas, L., Campos, A., Saldaña, J., & Parada, V. (2011). Scheduling copper refining and casting operations by means of heuristics for the flexible flow shop problem. Pesquisa Operacional, 31(3), 443–457. https://doi.org/10.1590/S0101-74382011000300002

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free