A makespan minimization problem for versatile developers in the game industry

3Citations
Citations of this article
7Readers
Mendeley users who have this article in their library.

Abstract

Today, the development of a modern video game draws upon multiple areas of expertise. Moreover, its development cost could be as high as tens of millions of dollars. Consequently, we should carefully schedule its jobs so as not to increase the total cost. However, project leaders traditionally treat developers alike or even schedule all the jobs manually. In this study, we consider a versatile-developer scheduling problem. The objective is to minimize the makespan of a game project. We propose a branch-and-bound algorithm (B&B) to generate the optimal schedules for small problem instances. On the other hand, an imperialist competitive algorithm (ICA) is proposed to obtain approximate schedules for large problem instances. Lastly, computational experiments are conducted to show the performances of both algorithms. When the problem size is small (e.g.= 12), B&B can generate the optimal schedules within 5 s. For some large problem instances (e.g., = 600), near-optimal schedules can be obtained by ICA within 10 min. The final results imply that both algorithms converge quickly and are of high solution quality.

Cite

CITATION STYLE

APA

Su, C. H., & Wang, J. Y. (2022). A makespan minimization problem for versatile developers in the game industry. RAIRO - Operations Research, 56(6), 3895–3913. https://doi.org/10.1051/ro/2022191

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free