Abstract
The organizational and technological solutions for high-rise buildings construction efficiency increase are considered, primarily - decrease of typical floor construction time and improvement of bearing structures concrete quality. The essence of offered technology is: a concrete mixing station and a polygon mainly for load-bearing wall panels with starter bars casting are located on the building site; for reinforced concrete components manufacturing and butt joints grouting the warmed-up concrete mixtures are used. The results of researches and elaborations carried out by the SPSUACE in area of a preliminary warming-up of concrete mixtures are presented. The possibility and feasibility of their usage in high-rise buildings and of excess height buildings construction including cast-in-place and precast execution are shown. The essence of heat-vibro treating of concrete mixture is revealed as a kind of prior electroresistive curing, and the achieved results are: accelerated concrete strength gain, power inputs decrease, concrete quality improvement. It is shown that the location of a concrete mixing station on the building site enables to broaden possibilities of the "thermos" method use and to avoid concrete mixtures warming up in medium-mass structures erection (columns, girders) during the high-rise buildings construction. It is experimentally proved that the splice between precast elements encased with warmed-up concrete mixture is equal with conjugated elements in strength.
Cite
CITATION STYLE
Kolchedantsev, L., Adamtsevich, A., Stupakova, O., & Drozdov, A. (2018). Measures to reduce construction time of high-rise buildings. In E3S Web of Conferences (Vol. 33). EDP Sciences. https://doi.org/10.1051/e3sconf/20183303062
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.