Congestion management is a major problem in deregulated power system. Congestion leads to increase in transmission line loading, increases losses and reducing transmission efficiency. It also leads to increase in congestion cost and thus affects technical as well as economical parameters. Research work is carried out under single line critical contingency condition. Critical contingency is found out by overall performance index (OPI). Optimal Power Flow (OPF) is carried out and objective is to maximize social welfare. Thyristor controlled series compensator is used to improve power flow, thus it reduces congestion and improves techno-economical parameters. Optimal location of Thyristor controlled series compensator (TCSC) is found out by LMP difference method.

Cite

CITATION STYLE

APA

Choudekar, P., Sinha, S., Asija, D., Ruchira, & Siddiqui, A. (2019). Transmission congestion management and techno economical analysis using placement of TCSC. International Journal of Innovative Technology and Exploring Engineering, 8(9 Special Issue), 237–242. https://doi.org/10.35940/ijitee.I1037.0789S19

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free