Abstract

Nowadays, the accuracy of setting out is stated by the articles of ISO 4463-1, but unfortunately it is not directly associated with permitted deviations from construction works as their accuracy should be assured and assessed by means of construction surveys. An earlier GOST 26433.0-85 states that the error of setting out must not exceed 80% and the error of an as-built survey up to 40% of corresponding permitted deviations from the construction element. Combining these limits enables deriving permitted deviations for the as-built survey and setting out.

Cite

CITATION STYLE

APA

Kala, V. (2009). Some problems of an as-built survey and setting out accuracy. Geodesy and Cartography, 35(3), 73–76. https://doi.org/10.3846/1392-1541.2009.35.73-76

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free