Abstract
Nowadays, the accuracy of setting out is stated by the articles of ISO 4463-1, but unfortunately it is not directly associated with permitted deviations from construction works as their accuracy should be assured and assessed by means of construction surveys. An earlier GOST 26433.0-85 states that the error of setting out must not exceed 80% and the error of an as-built survey up to 40% of corresponding permitted deviations from the construction element. Combining these limits enables deriving permitted deviations for the as-built survey and setting out.
Author supplied keywords
Cite
CITATION STYLE
Kala, V. (2009). Some problems of an as-built survey and setting out accuracy. Geodesy and Cartography, 35(3), 73–76. https://doi.org/10.3846/1392-1541.2009.35.73-76