Job Shop Layout Improvement with Simulation Technique: A Case of Metal Sheet Production

2Citations
Citations of this article
23Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

This paper investigates the improvement of job shop layout with simulation technique. A case study of Siam GN metal sheet, the manufacturer of customized metal sheet products was used. The objective is to increase production efficiency and reduce materials handling distance and time. Data regarding product and machine type were collected. CORELAP (Computerized Relationship Layout Planning) and Group technology based on ROC (rank order clustering) algorithm were applied to design the improved layouts. ARENA software was used to simulate the new layout from both techniques. The simulation show that CORELAP layout reduce production time by 17.12% while group technology layout reduces materials handling time by 11.41%. CORELAP layout therefore, was chosen for implementation. Simulation techniques allows user to experiment with different scenario hence selecting the most appropriate one without interfering with the actual process.

Cite

CITATION STYLE

APA

Laosiritaworn, W., Pinchai, N., & Jarupuncharadsri, P. (2020). Job Shop Layout Improvement with Simulation Technique: A Case of Metal Sheet Production. In IOP Conference Series: Materials Science and Engineering (Vol. 842). Institute of Physics Publishing. https://doi.org/10.1088/1757-899X/842/1/012023

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free