Analysis of Errors in Tunnel Quantity Estimation with 3D-BIM Compared with Routine Method Based 2D

  • Shin J
  • Baek Y
  • Park W
N/ACitations
Citations of this article
5Readers
Mendeley users who have this article in their library.

Abstract

In case of applying BIM method to the civil engineering of irregularly shaped structure, BIM method is recognized to have relatively high construction productivity. In this paper, we developed quantity calculation algorithms applying BIM method to NATM tunnel construction method and implemented BIM based 3D-BIM Modeling Quantity Calculation. The results showed that BIM-based method has high reliabilty in structure work in which errors occurred only in the range between 0.00% and -1.45%. On the other hand, BIM method applied to earth work showed great error range of -19.78% to 35.30%. So the benefit and applicability of BIM method in civil engineering were confirmed. In addition, routine method for the quantity of earth work has negligible error as in the case of structure work. But, rock type’s quantity calculation showed significant errors so that the reliability of 2D-based volume calculation is problematic. It may thus be concluded that 3D-BIM is more reliable than the routine method in estimating the quantity of earth work. Considering the reliability and merits in the stage of its design, construction and maintenance levels, the application of BIM to civil engineering works is recommended.

Cite

CITATION STYLE

APA

Shin, J.-C., Baek, Y.-I., & Park, W.-T. (2011). Analysis of Errors in Tunnel Quantity Estimation with 3D-BIM Compared with Routine Method Based 2D. Journal of the Korean Geotechnical Society, 27(8), 63–71. https://doi.org/10.7843/kgs.2011.27.8.063

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free