Life cycle climate change impact of a cost-optimal hvdc connection to import solar energy from australia to singapore

6Citations
Citations of this article
39Readers
Mendeley users who have this article in their library.

Abstract

This paper aims to evaluate the life cycle greenhouse gas (GHG) emissions of importing electrical power into Singapore, generated from a large-scale solar photovoltaic (PV) power plant in Australia, through a long-distance subsea high-voltage direct current (HVDC) cable. A cost optimization model was developed to estimate the capacities of the system components. A comprehensive life cycle assessment model was built to estimate emissions of manufacturing and use of these components. Our evaluation shows that, for covering one fifth of Singapore’s electrical energy needs, a system with an installed capacity of 13 GW PV, 17 GWh battery storage and 3.2 GW subsea cable is required. The life cycle GHG emissions of such a system are estimated to be 110 gCO2eq/kWh, with the majority coming from the manufacturing of solar PV panels. Cable manufacturing does not contribute largely toward GHG emissions. By varying full-load hours and cable lengths, it was assessed that sites closer to Singapore might provide the same energy at same/lower carbon footprint and reduced cost, despite the lower insolation as compared to Australia. However, these sites could cause greater emissions from land use changes than the deserts of Australia, offsetting the advantages of a shorter HVDC cable.

Cite

CITATION STYLE

APA

Ramachandran, S., Siala, K., de La Rúa, C., Massier, T., Ahmed, A., & Hamacher, T. (2021). Life cycle climate change impact of a cost-optimal hvdc connection to import solar energy from australia to singapore. Energies, 14(21). https://doi.org/10.3390/en14217178

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free