Incorporating BIM into the upper-division curriculum of construction engineering and management

16Citations
Citations of this article
88Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

This pedagogical study aimed to demonstrate an updated Building Information Modelling (BIM) educational activity in CEM (i.e., construction engineering and management) students’ final semester project. It investigated students’ perceptions of BIM and the project. Student feedback provided insights for linking education to practice, for example, what caused differences between manual estimates and BIM-generated quantity take-off. Four different project deliverable options demonstrated how educational theories could be embedded in BIM education. The novelty of this study lies in two aspects: firstly, this pedagogical research views the CEM education at the curriculum level by linking earlier years’ core CEM courses into the final project work; secondly, by designing four different options of BIM-related deliverables, subgroup analyses test how different factors, such as teamwork verse individual work, and BIM application level, could affect students’ learning outcomes. The current study also led to more future explorations in research-informed teaching in the CEM curriculum.

Cite

CITATION STYLE

APA

Wang, L., Huang, M., Zhang, X., Yan, X., Jin, R., Wanatowski, D., … Chohan, N. (2023). Incorporating BIM into the upper-division curriculum of construction engineering and management. European Journal of Engineering Education, 48(3), 482–501. https://doi.org/10.1080/03043797.2022.2112150

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free