State of the Art of BIM Integration with Sensing Technologies in Construction Progress Monitoring

11Citations
Citations of this article
85Readers
Mendeley users who have this article in their library.

Abstract

The necessity for automatic monitoring tools led to using 3D sensing technologies to collect accurate and precise data onsite to create an as-built model. This as-built model can be integrated with a BIM-based planned model to check the project’s status based on algorithms. This article investigates the construction progress monitoring (CPM) domain, including knowledge gaps and future research direction. Synthesis literature was conducted on 3D sensing technologies in CPM depending on crucial factors, including the scanning environment, assessment level, and object recognition indicators’ performance. The scanning environment is important to determine the volume of data acquired and the applications conducted in the environment. The level of assessment between as-planned and as-built models is another crucial factor that could precisely help define the knowledge gaps in this domain. The performance of object recognition indicators is an essential factor in determining the quality of studies. Qualitative and statistical analyses for the latest studies are then conducted. The qualitative analysis showed a shortage of articles performed on 5D assessment. Then, statistical analysis is conducted using a meta-analytic regression model to determine the development of the performance of object recognition indicators. The meta-analytic model presented a good sign that the performance of those indicators is effective where [p-value is = 0.0003 < 0.05]. The study is also envisaged to evaluate the collected studies in prioritizing future works from the limitations within these studies. Finally, this is the first study to address ranking studies of 3D sensing technologies in the CPM domain integrated with BIM.

Cite

CITATION STYLE

APA

Elqasaby, A. R., Alqahtani, F. K., & Alheyf, M. (2022, May 1). State of the Art of BIM Integration with Sensing Technologies in Construction Progress Monitoring. Sensors. MDPI. https://doi.org/10.3390/s22093497

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free