Abstract
Toll Constructing a toll road project always deals with various technical and non-technical problems. Those problems are considered as the risk of construction projects. These risks will definitely affect the project function and result in losses both in terms of cost, quality, and time, which determine the success of a project. Therefore, the purpose of this research was to identify and to analyze the risks using qualitative-quantitative research with the Soft System Methodology (SSM) on Sumatra Trans Toll Road Project Section I in Terbanggi besar - Kayu Agung. Collecting data, this research used purpose sampling techniques from respondents. In addition, data analysis methods used in this study are Probability Risk Test, Consequences Risk Test, and Soft System Methodology (SSM).
Cite
CITATION STYLE
Enriko Tosulpa, M., & Najid. (2020). Risk analysis of toll road construction project by using soft system methodology (ssm) a case study of sumatera trans toll road terpeka section 1 (Terbanggi Besar - Menggala). In IOP Conference Series: Materials Science and Engineering (Vol. 852). Institute of Physics Publishing. https://doi.org/10.1088/1757-899X/852/1/012036
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.