An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints

167Citations
Citations of this article
19Readers
Mendeley users who have this article in their library.
Get full text

Abstract

This paper discusses a scheduling technique, for cluster tools, that addresses postprocessing residency constraints and throughput requirements. The residency constraints impose a limit on the postprocessing time that a material unit spends in a processing module. The technique searches in the time and resource domains for a feasible schedule with a maximum throughput. It operates in two main phases; the initial one of which (and the lower complexity one) computes a simple periodic schedule. For a large number of problem instances, the simple periodic schedule feasibly solves the problem. If a feasible schedule cannot be found in the first phase, the scheduler enters phase two (the higher complexity one) to compute a feasible schedule. During this phase, the scheduler incrementally increases the period only if necessary, to keep the throughput at a maximum. Several heuristics are designed and added to reduce the complexity of the scheduling algorithm. The resulting schedules are deadlock free, since resources are scheduled according to the times that they are available. Analytical and experimental analyzes demonstrate the correctness and efficiency of our proposed technique.

Cite

CITATION STYLE

APA

Rostami, S., Hamidzadeh, B., & Camporese, D. (2001). An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints. IEEE Transactions on Robotics and Automation, 17(5), 609–618. https://doi.org/10.1109/70.964662

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free