Scheduling of single-arm multi-cluster tools with wafer residency time constraints in semiconductor manufacturing

60Citations
Citations of this article
12Readers
Mendeley users who have this article in their library.
Get full text

Abstract

This paper studies the challenging problem of scheduling single-arm multi-cluster tools with wafer residency time constraints. They have a linear topology and their bottleneck tool is process-bound. This work aims to find an optimal one-wafer cyclic schedule. With the Petri net model developed in our previous work and the minimal cycle time for a multicluster tool without wafer residency time constraints, it derives the necessary and sufficient schedulability conditions for multicluster tools with wafer residency time constraints for the first time. Then, it gives an algorithm to find an optimal one-wafer cyclic schedule if schedulable. This is done by simply setting the robots' waiting time for each tool. Thus, it is very computationally efficient and applicable to practical problems. An example is presented to illustrate the proposed method.

Cite

CITATION STYLE

APA

Zhu, Q., Wu, N., Qiao, Y., & Zhou, M. (2015). Scheduling of single-arm multi-cluster tools with wafer residency time constraints in semiconductor manufacturing. IEEE Transactions on Semiconductor Manufacturing, 28(1), 117–125. https://doi.org/10.1109/TSM.2014.2375880

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free